As an accomplished electrical engineer with extensive experience in the transmission planning sector, I’ve worked on a variety of analysis and power system studies designed to improve transmission and distribution systems across the country.
One of my notable accomplishments was the position paper I wrote on alternatives for solving Possible Violations -Planning events by studies on 500 KV tansmission systems for the 2020 NERC TPL planning assessment of the BC Hydro Bulk Electric System (BES).
My experience in this position paper demonstrates a deep understanding of NERC TPL-001 standard and the complex requirements for planning transmission and distribution systems in the T&D sector. I’m committed to delivering exceptional results and helping to create a better future for generations to come through my work in the T&D sector.