Sweetland Wind Farm 200 MW
September 21, 2023Completion of all NERC operational and planning studies pertaining to standards PRC-019, PRC-024, PRC-025, and PRC-027.completion of all NERC operational…Fisher Associates
September 21, 2023As a seasoned Senior Electrical Engineer, I have had the opportunity to design and perform various interconnection studies, including IFC…BC Hydro/Alberta 500 KV Transmission
September 21, 2023As an accomplished electrical engineer with extensive experience in the transmission planning sector, I've worked on a variety of analysis…Benton County Wind Farm and Camp Grove Wind Farm
September 21, 2023As an experienced electrical engineer with a strong background in renewable energy, I've performed a wide range of power system…116.28 MW Desert Harvest Solar Project Located in Palm Spring California
September 21, 2023Provide technical support and guidance to the construction team during the substation construction phase, including troubleshooting, problem-solving, and issue resolution.Florida Power & Light Company (FPL)-ATL for SERC
September 21, 2023As a NERC Auditor in the FRCC/SERC region based in Tampa, FL, I've played a critical role in ensuring compliance…Alcoa TN-Hydro Power Plants
September 21, 2023As a Sr. Electrical Engineer and NERC Compliance Manager, I've played a key role in ensuring the safety, reliability, and…ComEd/ExelonComEd/Exelon
September 21, 2023As a Senior Electrical Engineer/Manager, I've led many T&D projects that have helped to advance the industry and bring reliable…