Completion of all NERC operational and planning studies pertaining to standards PRC-019, PRC-024, PRC-025, and PRC-027.completion of all NERC operational and planning studies pertaining to standards PRC-019, PRC-024, PRC-025, and PRC-027.
Sweetland Wind Farm 200 MW
Completion of all NERC operational and planning studies pertaining to standards PRC-019, PRC-024, PRC-025, and PRC-027.completion of all NERC operational and planning studies pertaining to standards PRC-019, PRC-024, PRC-025, and PRC-027.
My Projects
Explore my projects and work experiences.
Oct 2018 - Oct 2020
Benton County Wind Farm and Camp Grove Wind Farm
As an experienced electrical engineer with a strong background in renewable energy, I've performed a wide range of power system studies for Benton county and Camp Grove wind farms.
Jul 2018 - Mar 2020
116.28 MW Desert Harvest Solar Project Located in Palm Spring California
Provide technical support and guidance to the construction team during the substation construction phase, including troubleshooting, problem-solving, and issue resolution.
Dec 2021 - Jan 2022
BC Hydro/Alberta 500 KV Transmission
As an accomplished electrical engineer with extensive experience in the transmission planning sector, I've worked on a variety of analysis and power system studies designed to improve transmission and distribution systems across the country.
Oct 2011 - Nov 2013
Alcoa TN-Hydro Power Plants
As a Sr. Electrical Engineer and NERC Compliance Manager, I've played a key role in ensuring the safety, reliability, and efficiency of hydro power plants in Alcoa TN/ Knoxville TN.