Fisher Associates

As a seasoned Senior Electrical Engineer, I have had the opportunity to design and perform various interconnection studies, including IFC electrical drawing package, for over 150 MW solar and energy storage projects from January 2022 to April 2023.

Autocad Logo

AutoCAD

1+ Years
DigSilentInterna Logo

DIgSILENT

1+ Years
Etap Logo

Etap

1+ Years
MicroStation Logo

Bentley

1+ Years
PSSE Logo

Siemens

1+ Years
SEL Logo

Sel

1+ Years
Easy Power Logo

EasyPower

1+ Years
PSCad Logo

PS Cad

1+ Years
SKM Power Tools Logo

SKM PowerTools

1+ Years
Cyme Logo

Cyme

1+ Years

As a seasoned Senior Electrical Engineer, I have had the opportunity to design and perform various interconnection studies, including IFC electrical drawing package, for over 150 MW solar and energy storage projects from January 2022 to April 2023.

400 MW Solar/BESS/Wind Projects in Various States:

  • Lead the commercial optimization efforts for solar and storage projects, with a focus on site grading, equipment selection, running PV layouts, and supporting production estimates.
  • Work with cross-functional teams to bring solar and storage projects to inception, assess the design viability at every stage in the project’s life, and ensure that the project design is aligned with the commercial objectives.
  • Select the optimal equipment and technology for the project, including solar panels, inverters, and batteries, based on their performance, cost, and reliability.
  • Run PV layouts to optimize the system’s energy production and assess the project’s production estimates to ensure that they align with the commercial objectives.
  • Optimize site grading to reduce construction costs and minimize the environmental impact of the project.
  • Develop and optimize the project’s construction schedule to ensure that it is completed on time and within budget.

My Projects

Explore my projects and work experiences.

Jul 2023 - Jul 2023

Sweetland Wind Farm 200 MW

Completion of all NERC operational and planning studies pertaining to standards PRC-019, PRC-024, PRC-025, and PRC-027.completion of all NERC operational and planning studies pertaining to standards PRC-019, PRC-024, PRC-025, and PRC-027.

Dec 2021 - Jan 2022

BC Hydro/Alberta 500 KV Transmission

As an accomplished electrical engineer with extensive experience in the transmission planning sector, I've worked on a variety of analysis and power system studies designed to improve transmission and distribution systems across the country.

Sep 2017 - Feb 2018

Florida Power & Light Company (FPL)-ATL for SERC

As a NERC Auditor in the FRCC/SERC region based in Tampa, FL, I've played a critical role in ensuring compliance with critical regulations governing the operation of power plants across the SERC/FRCC region.

Oct 2018 - Oct 2020

Benton County Wind Farm and Camp Grove Wind Farm

As an experienced electrical engineer with a strong background in renewable energy, I've performed a wide range of power system studies for Benton county and Camp Grove wind farms.

Let’s Talk About Your Project

Contact Now
Sonny Patel Headshot Image