BC Hydro/Alberta 500 KV Transmission

As an accomplished electrical engineer with extensive experience in the transmission planning sector, I've worked on a variety of analysis and power system studies designed to improve transmission and distribution systems across the country.

Autocad Logo

AutoCAD

1+ Years
DigSilentInterna Logo

DIgSILENT

1+ Years
Etap Logo

Etap

1+ Years
MicroStation Logo

Bentley

1+ Years
PSSE Logo

Siemens

1+ Years
SEL Logo

Sel

1+ Years
Easy Power Logo

EasyPower

1+ Years
PSCad Logo

PS Cad

1+ Years
SKM Power Tools Logo

SKM PowerTools

1+ Years
Cyme Logo

Cyme

1+ Years

As an accomplished electrical engineer with extensive experience in the transmission planning sector, I’ve worked on a variety of analysis and power system studies designed to improve transmission and distribution systems across the country.

One of my notable accomplishments was the position paper I wrote on alternatives for solving Possible Violations -Planning events by studies on 500 KV tansmission systems for the 2020 NERC TPL planning assessment of the BC Hydro Bulk Electric System (BES).

My experience in this position paper demonstrates a deep understanding of NERC TPL-001 standard and the complex requirements for planning transmission and distribution systems in the T&D sector. I’m committed to delivering exceptional results and helping to create a better future for generations to come through my work in the T&D sector.

My Projects

Explore my projects and work experiences.

Jun 1997 - Oct 2011

ComEd/ExelonComEd/Exelon

As a Senior Electrical Engineer/Manager, I've led many T&D projects that have helped to advance the industry and bring reliable power to communities across the US.

Sep 2017 - Feb 2018

Florida Power & Light Company (FPL)-ATL for SERC

As a NERC Auditor in the FRCC/SERC region based in Tampa, FL, I've played a critical role in ensuring compliance with critical regulations governing the operation of power plants across the SERC/FRCC region.

Jul 2023 - Jul 2023

Sweetland Wind Farm 200 MW

Completion of all NERC operational and planning studies pertaining to standards PRC-019, PRC-024, PRC-025, and PRC-027.completion of all NERC operational and planning studies pertaining to standards PRC-019, PRC-024, PRC-025, and PRC-027.

Oct 2018 - Oct 2020

Benton County Wind Farm and Camp Grove Wind Farm

As an experienced electrical engineer with a strong background in renewable energy, I've performed a wide range of power system studies for Benton county and Camp Grove wind farms.

Let’s Talk About Your Project

Contact Now
Sonny Patel Headshot Image